Home Blog Archive Windows Windows 7: network change order

Windows 7: network change order

  • Feb 03, 2026
  • 513
  • 0

How you can change the network order in Windows 7, we will show you in this practical tip.

To change the network order in Windows 7

  1. First of all, you can call up the "control panel" by clicking in the bottom left of the task click the "Windows icon" and then click "control panel," click. Alternatively, you can type in the Windows search "system panel" and confirm with [Enter].
  2. In the category view, click "network and Internet".
  3. Then click on "network and sharing center".
  4. In the Overview, click change on the left on "change adapter settings".
  5. Now press [Alt] to display the menu bar.
  6. Click in the menu bar, click the "Advanced" tab and finally click on "Advanced settings...".
  7. To change the order of the network access, click once on the desired network connection and then click the green arrows to the right, to change the Position. The network connection, the first, is used first. The others follow in order.
  8. Finally, confirm with "OK".
Win 7 Network Order
How to use the network key to find out can, we show you in this practical tip.

YOU MAY ALSO LIKE

0 COMMENTS

LEAVE A COMMENT

Human?
1 + 3 =